Painting contractor software

Measured scope to finished work.

Keep the rooms, surfaces and preparation behind the price connected to the work your crew delivers. OrdexisOne brings assessed scope, structured estimates, customer options, assigned visits and billing into your company's branded operation.

Room 2 at 47 Elm Court on quote packet Q810, with its walls, ceiling, trim, door and window each measured, prepared and coated.One measured wall run of Room 2 at 47 Elm Court, drawn flat in elevation at 130 units to the metre: the 3.40 metre run is 2.55 metres to the ceiling and contains a 1.20 by 1.10 metre window with its sill and casing, and a 0.81 by 2.05 metre door with casing and leaf. Five surfaces are keyed on the drawing and listed beside it — walls at 42.3 square metres filled and sanded before coating, ceiling at 18.7 square metres with spot repairs and sanding, trim at 27 metres of baseboard and casings sanded, one door leaf with both faces and edges sanded, and one window with casing and sill sanded. Every listed surface receives two coats of the specified low-sheen white. The measured totals are for the whole room, and quote packet Q810 for 47 Elm Court carries two options, assessed on 4 May 2026 by A. Rivera U-037. Areas, lengths, dates and record numbers are illustrative recorded service values, and no price is shown because the rates are configured by the business.PAINTING / THE SPECIFIED SURFACESThe wall area is one part of the specified scope.ROOM 2 · 47 ELM COURT · QUOTE PACKET Q810 · MEASURED, PREPARED AND FINISHED SURFACESROOM 2 — WALL ELEVATION, ONE 3.40 m RUNSPECIFIED SURFACES · MEASURED AND PREPARED02030104053.40 m2.55 mSPECIFIED SURFACESTWO COATS EACH01WALLS42.3 m²filled and sanded before coating02CEILING18.7 m²spot repairs and sanding03TRIM27 mbaseboard and casings, sanded04DOOR1 leafboth faces and edges sanded05WINDOW1 openingcasing and sill sandedLow-sheen white · measured totals for Room 2PROPERTY AND ROOM47 Elm Court · Room 2ASSESSED4 May 2026 · A. Rivera U-037QUOTE PACKETQ810 · 2 optionsThe wall area is one part of the specified scopeCeiling, trim, door and window carry their own preparation and finish · quantities are measured service valuesIllustrative painting scope · areas, lengths and dates are recorded service values · no price is shown because your business configures the ratesPAINTING · THE SPECIFIED SURFACESThe wall area is one part of the scope.Room 2 · 47 Elm Court · quote packet Q81002030104053.40 mSPECIFIED SURFACES · TWO COATS EACH01WALLS42.3 m²filled and sanded02CEILING18.7 m²spot repairs03TRIM27 msanded04DOOR1 leaffaces and edges05WINDOW1 openingcasing and sillIllustrative painting scope · quantities are measured service valuesPAINTING · THE SPECIFIED SURFACESThe wall area is onepart of the scope.Room 2 · 47 Elm Court · packet Q81002030104053.40 m2.55 m01WALLS42.3 m²filled and sanded02CEILING18.7 m²spot repairs, sanded03TRIM27 msanded, gaps filled04DOOR1 leaffaces and edges05WINDOW1 openingcasing and sillIllustrative painting scope · quantities are measured service valuesTwo finish coats on every listed surface

The wall area is one part of the estimate. Surface condition, preparation, specified materials and the work included in the finish are what make the customer's price meaningful.

The estimate carries the preparation

Describe the finish you are actually selling.

A single-room refresh, several occupied rooms and exterior repainting call for different assessments. Collect the property and requested work first, then build the estimate around the surfaces and conditions your team confirms.

Rooms and surfaces
Keep the rooms, relevant measurements and the surfaces included in the quote together. Scope notes can distinguish walls, ceilings, trim and other work so the proposal describes what the price covers.
Preparation and site conditions
Record the preparation your team has assessed and relevant property conditions. Access arrangements and the requested work belong with the visit and proposal, where the office can refer to them during planning.
Materials and labor
Use configured project components, material supplies, labor assumptions and rate structures in complex manual-quote workflows. Review estimated costs and the proposed selling price using the data your business maintains.
Specified finish and alternatives
Preserve selected product, color or finish information in the supporting scope where required. Present different work as separate quote options with their own line items and price.

Make your estimating method reusable.

Calculator templates and rate matrices can bring measurements, materials, labor and price rules into a repeatable estimating structure. Material records supply the units and cost information used by those configured components.

Explore calculators and rate matrices →
The 17.0 litres of coating that Room 2 at 47 Elm Court requires, taken off surface by surface with the preparation each one carries.A material take-off for Room 2 at 47 Elm Court on quote packet Q810, where every listed surface receives two coats. On the left a graduated measure stands on its datum against a litre scale marked every five litres, and the recorded requirement is marked at 17.0 litres. On the right the same requirement is taken off surface by surface: walls need 8.5 litres, being 42.3 square metres filled and sanded at two coats and 10 square metres per litre; the ceiling needs 3.7 litres, being 18.7 square metres with spot repairs and sanding at two coats and 10 square metres per litre; the trim needs 3.9 litres, being 27 metres of baseboard and casing sanded with gaps filled at two coats and 14 metres per litre; and the door and window need 0.9 litres, being 3.7 square metres of leaf faces and window trim at two coats and 8 square metres per litre. Those four lines total 17.0 litres of coating for the room. Areas, lengths, litres and coverage rates are illustrative measured service values, and no price is shown because the rates are configured by the business.PAINTING / THE ESTIMATE CARRIES THE PREPARATIONPreparation and material, measured surface by surface.ROOM 2 · 47 ELM COURT · QUOTE PACKET Q810 · TWO COATS ON EVERY LISTED SURFACEMATERIAL REQUIRED FOR ROOM 25 L10 L15 L20 L17.0 LTWO COATS, ALL SURFACESSURFACE, PREPARATION AND BASISLITRESWALLS8.5 L42.3 m² · filled and sanded · 2 coats at 10 m²/LCEILING3.7 L18.7 m² · spot repairs and sanding · 2 coats at 10 m²/LTRIM3.9 L27 m · sanded, gaps filled · 2 coats at 14 m/LDOOR AND WINDOW0.9 L3.7 m² · leaf faces and window trim · 2 coats at 8 m²/LTOTAL COATING FOR ROOM 217.0 LPreparation and material are estimated surface by surface, not from wall area aloneIllustrative estimate take-off · areas, lengths and litres are measured service values · no price is shown because your business configures the ratesPAINTING · THE ESTIMATE CARRIES THE PREPARATIONPreparation and material, measured.MATERIAL REQUIRED5 L10 L15 L20 L17.0 LWALLS8.5 L42.3 m² · filled and sanded · 10 m²/LCEILING3.7 L18.7 m² · spot repairs · 10 m²/LTRIM3.9 L27 m · sanded · 14 m/LDOOR AND WINDOW0.9 L3.7 m² · faces and trim · 8 m²/LTOTAL COATING17.0 LIllustrative take-off · litres aremeasured service values
The customer decision

Present the options. Keep the selected scope.

An option-based quote lets the customer choose among the work you have assessed. One room or several, a different preparation scope or an additional surface can be explained with the details that support each price.

Arrange an assessment in your system.

Customers can request an in-person quote with their property and service details. The office schedules the visit; supported quote-visit status and rescheduling actions keep the appointment connected to the customer.

Send a proposal that can be reviewed.

Build the manual quote, attach measurement information and preserve scope notes. Organize multiple options into a packet, set timing and expiration, preview the customer-facing result and generate a PDF.

Explore estimates and quote visits →

Give the crew the job you sold.

Production needs the selected scope, practical site information and assigned work. Keep that context available when the office arranges preparation, painting and follow-up visits.

Schedule the visits.

Use day, week and staff calendars to plan appointments and assign the team. Add further visits when the work requires them, review workloads and edit or reassign appointments as the office manages the job.

For exterior work, configured weather monitoring supplies service-confidence information and recommendations for scheduling decisions.

Explore scheduling and dispatch →

Keep field information with the property.

Your branded staff PWA gives the team assigned stops, property information and service details. Crews record travel, on-site and hold time, plus supported field reports about hazards, incidents or general observations.

If the site needs further attention, the office has a recorded context for customer discussion and the next appointment.

Explore the staff field experience →
Room 2 at 47 Elm Court on work order MW-034, planned for the crew with the floor covered, the trim masked and 17.0 litres staged at the door.Room 2 at 47 Elm Court on work order MW-034, drawn flat in plan as the crew receives it at 40 units to the metre: the room is 5.50 by 3.40 metres, the 3.40 metre wall run carries the window between 0.38 and 1.58 metres and the door between 2.19 and 3.00 metres, and the door swings into the room. The protected floor area is marked as a measured envelope covering 18.7 square metres of dust sheet, 27 metres of baseboard and casing are masked and kept clear, the door to the hall is left clear, and the 17.0 litres of coating selected under option O-266 are staged inside the door on the protected floor. The assigned visit is Tuesday 12 May from 08:00 to 15:00 with Alex Rivera U-037 and vehicle V-12, and the field record captures travel, on-site and hold time. The plan, protected areas, staged litres and visit records are illustrative recorded service values, and no price is shown because the rates are configured by the business.PAINTING / PREPARED FOR THE WORKThe crew gets the scope that was sold, prepared.WORK ORDER MW-034 · 47 ELM COURT · ROOM 2 · SELECTED SCOPE O-266 · ASSIGNED TUE 12 MAYTHE ASSIGNED VISITWORK ORDERMW-034 · 47 Elm Court · Room 2ASSIGNED VISITTue 12 May · 08:00–15:00CREW AND VEHICLEAlex Rivera U-037 · V-12SELECTED SCOPEO-266 · five surfaces · 17.0 L stagedROOM 2 · PLAN AS RECEIVED17.0 LFLOOR COVERED18.7 m²5.50 mPROTECTED, STAGED AND RECORDEDPROTECTED WORK AREA18.7 m² floor sheet downMASKED AND KEPT CLEAR27 m baseboard and casingsACCESSdoor to the hall, left clearRECORDED IN THE FIELDtravel, on-site and hold timeIllustrative prepared scope · the plan, protected areas, staged litres and visit records are recorded service values · no price is shown because your business configures the ratesPAINTING · PREPARED FOR THE WORKThe crew gets the prepared room.17.0 LFLOOR COVERED18.7 m²MW-034 · 47 Elm Court · Room 2Tue 12 May · Alex Rivera U-037O-266 · five surfaces · 17.0 LIllustrative prepared scope · recorded service values · no price is shownPAINTING · PREPARED FOR THE WORKThe crew gets theprepared room.MW-034Tue 12 May · A. Rivera U-037O-266 · five surfaces · 17.0 L17.0 LFLOOR COVERED18.7 m²Illustrative prepared scoperecorded service values
Materials and operating cost

Keep the estimate's assumptions visible to the business.

Material supplies maintain reusable units and cost information for estimating. Supported inventory workflows provide stock, purchasing and receiving context for materials your operation carries.

Explore material supplies →

Maintain the equipment behind the work.

Manage equipment and vehicle records, eligible assignments, maintenance rules and work orders. Runtime, distance and operating costs help the office understand and maintain the assets used by its teams.

Explore equipment management →

Review the work after delivery.

Supported reporting brings field time, revenue and recorded costs into staff, customer and service views. Use the operating history when reviewing your estimating assumptions and the types of painting work the business sells.

Explore operating reports →

Close the project with the customer history intact.

Keep invoice line items, totals, PDFs and payment records with the account. The customer can review supported invoice details and use the payment methods configured for your business.

Supported e-transfers reconcile automatically when all configured security measures match. A security mismatch sends only that exception to office review, with the notification and invoice context together.

Explore invoice operations →
Room 2 at 47 Elm Court is handed back finished on work order MW-034, with invoice I-208 recording the charge lines, the reconciled payment and the next request.Room 2 at 47 Elm Court on work order MW-034, drawn as the finished 3.40 metre wall run at 82 units to the metre: the window between 0.38 and 1.58 metres and the door between 2.19 and 3.00 metres are painted out, the trim is back in place and nothing is masked. Beside it, invoice I-208 issued on 15 May carries three charge lines — walls and ceiling at 61.0 square metres with two coats, trim, door and window at 27 metres and one set, and the floor sheet and masking across 18.7 square metres — each recorded as painted or completed. The invoice retains scope quote packet Q810 and option O-266 with the PDF, records a computed total of three charge lines, a payment reconciled automatically from a matching e-transfer, and a balance settled in full. Below it, the dated record shows Room 2 assessed on 4 May, option O-266 painted on 12 to 14 May, invoice I-208 issued on 15 May, and the customer asking about Room 4 on 28 June against the same property and history. Dates, record numbers and quantities are illustrative recorded service values, and no amount is printed because the rates are configured by the business.PAINTING / THE CLOSEOUT RECORDThe finished room and the payment record close together.WORK ORDER MW-034 · 47 ELM COURT · ROOM 2 · OPTION O-266 · INVOICE I-208ROOM 2 AS HANDED BACK · ONE 3.40 m RUNINVOICE I-208ISSUED 15 MAY · PDF RETAINED01Walls and ceiling · 61.0 m² · two coatsPainted02Trim, door and window · 27 m and one setPainted03Floor sheet and masking · 18.7 m² protectedCompletedSCOPE RETAINED · Q810 · OPTION O-266 · PDFCHARGE LINES3PAYMENTE-transfer reconciled automaticallyBALANCESettled in fullWHAT CONTINUES AFTER THE VISIT4 MAY 2026Room 2 assessed42.3 m² walls, 18.7 m² ceiling12–14 MAY 2026Option O-266 paintedfive surfaces, two coats15 MAY 2026Invoice I-208 issuede-transfer reconciled28 JUNE 2026Customer asks about Room 4same property and historyThe finished work, the payment record and the next request stay with the propertyIllustrative closeout record · record numbers, dates and quantities are recorded service values · no amount is printedPAINTING · THE CLOSEOUT RECORDFinished work and payment, one record.INVOICE I-208Walls and ceiling · 61.0 m²Trim, door and window · 27 mProtection · 18.7 m² coveredPAYMENT · e-transfer reconciled · settled in full4 MAYRoom 2 assessedwalls and ceiling measured12–14 MAYOption O-266 paintedfive surfaces, two coats15 MAYInvoice I-208 issuede-transfer reconciledFinished work and payment stay with the propertyIllustrative closeout record · no amount is printed

Keep the painting business connected from estimate to closeout.

Advanced estimating and operating capabilities depend on the selected plan, maintained templates and data, configuration and connected providers.

Order Now →